Saved property catalogue · 6 Oct 2026, 10:01 AM · Prices and availability require confirmation.
← Back to results

The Oasis · Dubai

Address Villas Tierra — four- to six-bedroom villas at The Oasis

Project starting price — Emaar website · 15 October 2026

AED 13,160,000

View photos

Overview

Tierra brings the Address name to a collection of four- to six-bedroom villas at The Oasis by Emaar. The developer’s website advertised a project starting price of AED 13.16 million when checked on 15 October 2026. This is not a confirmed price for a home in the new release.

Emaar’s illustrations show glazed façades and open interiors facing the surrounding landscape. The community plan includes a swimmable lagoon, jogging and cycling routes, and sports facilities. Review the selected plot and villa plan for its actual outlook and specification; community facilities are not private amenities of every villa.

The Emaar group announcement includes Tierra and Palace Ostra in an additional release on 19 October 2026. Tierra’s official brochure and floor plans are available below for comparing designs. These project documents do not identify which homes remain available in that release.

Features

Home type
Villas · 4–6 bedrooms
Community
The Oasis · Dubai
Residential brand
Address

Property highlights

  • Address-branded villas with four to six bedrooms.
  • Original Emaar brochure and floor plans available to download.
  • Advertised project starting price: AED 13.16 million; obtain a quotation for the selected home.

Facilities & location

Project: Address Villas Tierra

By Emaar Properties

Location in The Oasis

Tierra forms part of The Oasis in Dubai. Announced community facilities include parks, playgrounds, outdoor tracks and a swimmable lagoon; the gallery illustrates the proposed development.

Location sources

Area information describes the neighbourhood. Individual routes, admission and access to facilities depend on the selected address and provider.

MORE ABOUT THIS OFFER

Additional property details

A short look at The Oasis

Emaar’s sales team shared this clip on 16 October 2026 under the name The Oasis. It shows water, nearby villas and landscaping. The post does not identify the villas as Tierra or Ostra, give the filming date or establish handover readiness for either collection.

Source: Emaar sales-team post, 16 October 2026 at 16:04. Visual copy without audio, approximately 12 seconds; shown as community context only.

Download the silent video

Address and Palace collection — October 2026 film

This 50-second sales-team film shows architectural views of The Oasis, interiors and villa designs, including a five-bedroom Signature design. It is a collection-level presentation: the footage does not identify a particular Tierra or Ostra unit, confirm availability or document construction progress.

Source: Emaar sales-team video shared on 14 October 2026 at 09:39. Its invitation refers to a release event on 19 October 2026, 5–10 pm, at the Ballroom, Palace Downtown. The dated invitation is retained within the film; it is not confirmation of a current allocation or booking. Silent copy.

Download the silent collection film

Tierra construction footage — August 2026 reference

The opening title of this Emaar film identifies the construction update as August 2026, although the sales team shared it on 15 October. Its Tierra sequences label Phase 3 A1 at 6.69% and Phase 3 A2 at 7.68%. These are the film’s figures for those subdivisions and that reference period, not a combined percentage for Tierra or a statement of today’s progress.

The 93-second film also covers Palmiera, Mirage, Lavita, Ostra and Phase 1 facilities. Read each on-screen label with its own footage: progress shown elsewhere in The Oasis does not describe a Tierra home. The final architectural rendering illustrates the intended setting. The film supplies no exact-unit completion certificate, revised handover commitment or current availability.

Source: Emaar sales-team video shared on 15 October 2026 at 11:43; opening reference: August 2026. Tierra phase labels and settled on-screen figures were checked against the film. Silent viewing copy.

The Oasis construction update, labelled August 2026 — Tierra Phase 3 A1 and A2 appear near the end. Figures remain specific to their labelled phase and historical reference period.

Advertised annual payment distribution

Materials shared in the Emaar group on 15 October 2026 show the following annual distribution, totalling 100% of the property price. This is a release-level summary, not a unit’s contractual instalment schedule; it establishes neither purchase fees nor a handover date.

  1. 202610%
  2. 202720%
  3. 202830%
  4. 202940%

Project brochure and floor plans

General project files from Emaar’s website, not a villa reservation offer. Final specifications and areas depend on the design, plot and sale agreement.

The Emaar group materials announce an additional release at Palace Downtown on 19 October 2026. No guaranteed allocation or current unit availability is claimed.

Compare the other villa collection at The Oasis

Property information

Project information reviewed on 15 October 2026. The published starting price is project-wide and does not confirm a villa’s price or availability in the 19 October release. Areas, outlook, final price and purchase fees require a unit-specific written offer.

Developer status source