Prices and availability subject to confirmation.
← Back to results

Wadi Al Safa 4 · Dubai

Laguna Residence three-bedroom pool configuration in City of Arabia

2026-11-24 · AED 3,768,000

AED 3,768,000

View photos

Overview

For a household that needs bedrooms and a separate room for help or other practical use, this Laguna Residence offer describes a different scale of home from the project's smaller apartments. One Development's 24 November message combines three bedrooms, a maid's room and a private pool in a stated total of 2,215.21 sq ft. It describes a high-floor Dubai skyline view. The message does not identify a unit number or exact floor, so use the floor plan and written unit schedule to establish the particular property before comparing it with alternatives.

The quoted price was AED 3,768,000 on the date of the message. One Development mentioned a 30/70 payment plan and an expected Q4 2028 handover, without a full instalment schedule. Put the private outdoor space, household layout and timing of the remaining payment on the same checklist before making a reservation; obtain the current offer and contractual dates for the unit selected.

Features

Offer scope
3 bedrooms, maid's room and private pool
Area
2,215.21 sq ft
Dated price
AED 3,768,000

Property highlights

  • 2,215.21 sq ft
  • AED 3,768,000

Facilities & location

Project: Laguna Residence — 3-bedroom pool configuration, 24 November 2026

By One Development

Location in Wadi Al Safa 4

MORE ABOUT THIS OFFER

Additional property details

Project specification

Building configuration
3 Bedroom + maid's room

Unit options & prices

The quoted line describes a three-bedroom pool configuration; the sheet gives no apartment number.

3 bedrooms · Apartments

2,215.21 sq ft205.8 m²

AED 3,768,000

Maid's room · Private pool stated in dated offer

How to Read a Dubai Apartment Floor Plan Before You Buy

Property information

This is a dated configuration offer, not an identified unit listing. The message does not establish current stock or a contractual completion date.

Sales message targets Q4 2028; confirm the contract date