HMB "Beverly Park"
- Handover
- Dec 2027
- Area
- 734 – 1,169 sqft
About the project
Beverly Park is a residential development by HMB Homes, located in the Dubailand Residence Complex area. The project emphasizes architectural harmony and structural strength — its vertical symmetry, clean geometry, and panoramic glazing give the building a sense of stability, sophistication, and tranquility. The architecture of Beverly Park embodies the essence of a modern home, where structure, light, and space coexist in perfect balance.
The residential complex comprises two basement levels, a ground floor, and eleven residential floors with apartments. Available units include studios and one- and two-bedroom apartments, featuring spacious layouts, large windows, and thoughtfully designed interiors that ensure maximum comfort and functionality.
Residents of Beverly Park can enjoy a wide range of amenities designed for both relaxation and active living: a swimming pool, a rooftop lounge, a luxurious lobby, a cinema, a yoga zone, a children’s play area, and a barbecue space. Every area is carefully designed to create an atmosphere of serenity, inspiration, and community.
Thanks to its prime location in Dubailand Residence Complex, the development offers quick access to key city destinations: 8 minutes to Silicon Central Mall, 10 minutes to Dubai Outlet Mall, 15 minutes to Dubai Mall and Burj Khalifa, 16 minutes to Global Village, 18 minutes to Dubai International Airport, and 28 minutes to Al Maktoum International Airport.
Units
Types
Layouts
Finishes
Amenities
- BBQ
- Billiards
- Cabanas
- Cinema
- Covered gym
- Coworking zone
- Floating Cabana
- Jogging tracks
- Kids Play Area
- Landscaped garden
- Leisure areas
- Lift
- Lobby
- Lounge
- Meditation Garden
- Meditation zone
- Meeting Room
- Mini Golf
- Multipurpose Sports Courts
- Outdoor cinema
- Recreational areas
- Rooftop Pool
- Shared Pool
- Shared gym & fitness
- Sitting Area
- Smart home
- Social zone
- Table Tennis
Payment plans
Payment Plan 1
20% down
- 20% + 4% DLD + 3150 AED Admin Fees + VATOn booking
- 10%After 60 days from booking date
- 10%Upon completion of construction by 20%
- 10%Upon completion of construction by 40%
- 10%Upon completion of construction by 60%
- 40%Upon completion of construction by 100%
Payment Plan 2 (for 2 BR)
20% down
- 20% + 4% DLD + 3150 AED Admin Fees + VATOn booking
- 10%Upon completion of construction by 20%
- 70%Upon completion of construction by 100%
Location