OBJECT 1 "LUM1NAR Tower 3"
- التسليم
- Jun 2027
- المساحة
- 555 – 1,359 sqft
عن المشروع
LUM1NAR Tower 3 is the third tower of a residential complex by Object One Real Estate Development, located in the Jumeirah Village Triangle area. The development unites three towers with a harmonious architectural rhythm and a contemporary design. Each tower comprises 25 floors, forming an integrated residential ensemble with a well-planned infrastructure. The third tower consists of a basement, a ground floor, five podium levels, twenty residential floors, and a roof.
The tower features studios and 1-, 2-, and 3-bedroom apartments. Spacious layouts, panoramic glazing, and warm color palettes create an atmosphere of light and comfort. Interiors are designed in a minimalist style with wooden accents and soft lighting, shaping modern yet cozy living spaces.
LUM1NAR Tower 3 offers a wide range of amenities that strike a balance between relaxation and active living. Residents can enjoy a swimming pool with a terrace and sun loungers, a children’s pool, a gym, a yoga studio, a sauna, an open-air lounge and an outdoor kitchen. For families, there is a children’s playroom and an outdoor playground, while tech-savvy residents can benefit from smart home systems and digital locks.
The location in Jumeirah Village Triangle ensures quick access to Dubai’s key destinations: 9 minutes to Dubai Miracle Garden, 15 minutes to Mall of the Emirates and Circle Mall, 17 minutes to Dubai Hills Mall, and around 20 minutes to Palm Jumeirah and JBR.
الوحدات
الأنواع
المخططات
التشطيبات
المرافق
- Accessibility for people with disabilities
- BBQ
- Children’s pool
- Club house
- Covered Parking
- Dining outlets (coffee houses & restaurants)
- Kids Play Area
- Leisure areas
- Lift
- Lobby
- Prayer room
- Recreational areas
- Sauna
- Shared Pool
- Shared gym
- Shared gym & fitness
- Smart home
- Social zone
- Yoga studio
خطط السداد
Payment Plan 1
50% دفعة أولى
- 50% + 4% DLD + 5050 AED Registration feesWithin 14 days from the reservation date
- 10%September 2026
- 40%On handover
Payment Plan 2 (21 months post handover)
50% دفعة أولى
- 50% + 4% DLD + 5050 AED Registration feesWithin 14 days from the reservation date
- 10%September 2026
- 5%On handover
- 35% (5% every 3 months)Post handover from December 2027 to June 2029
الموقع